MDB GP Room Operation Checklist Project
Environmental
31 December 2025
The Company implemented operational control in the MDB GP area through a structured checklist system, resulting in a reduction of electricity consumption by 29,233.15 kWh/year. This corresponds to approximately 0.31% of total baseline energy consumption.